Keeping tradition with doing things backwards, I’ve finally got a UPS for the rack (mounted in the bottom of the stack). Got a PowerWalker VI 2200R. Its a 2U unit which is all the space I’ve got left in the rack. Decent price and decent I/O with USB, serial and a slot-in for network expansion + 4 IEC outputs. Its powering everything in the rack and connected via USB to my main server which runs a NUT server that other machines can connect to. A calibration run (100-80%) puts the runtime at about 20 min. Long enough that I’m comfortable setting things to shut down when 20% capacity remains. Summary, I sleep better now.

The rack with the UPS at the bottom

NUT output

  • Decronym@lemmy.decronym.xyzB
    link
    fedilink
    English
    arrow-up
    2
    arrow-down
    1
    ·
    edit-2
    9 months ago

    Acronyms, initialisms, abbreviations, contractions, and other phrases which expand to something larger, that I’ve seen in this thread:

    Fewer Letters More Letters
    NAS Network-Attached Storage
    NUC Next Unit of Computing brand of Intel small computers
    SAN Storage Area Network
    ZFS Solaris/Linux filesystem focusing on data integrity

    4 acronyms in this thread; the most compressed thread commented on today has 11 acronyms.

    [Thread #608 for this sub, first seen 16th Mar 2024, 23:05] [FAQ] [Full list] [Contact] [Source code]