    I once had a manager hand me a project brief and ask me how quickly I thought I could complete it. I was managing my own workload (it was a bad situation), but it was a very small project and I felt that I had time to put everything else on hold and focus on it. So, I said that I might be able to get it done in four days, but I wouldn’t commit to less than a week just to be sure.

    The manger started off on this half-threatening, half-disappointed rant about how the project had a deadline set in stone (in four days’ time), and how the head of the company had committed to it in public (which in hindsight was absolute rot). I was young and nervous, but fortunately for me every project brief had a timeline of who had seen it, and more importantly, when they had received it. I noticed that this brief had originated over three months prior, and had been sitting on this manager’s desk for almost a month. I was the first developer in the chain. That gave me the guts to say that my estimate was firm, and that if anyone actually came down the ladder looking for heads to set rolling (one of the manager’s threats), they could come to me and I would explain.

    In the end nothing ever came of it because I managed to get the job done in three days. They tried to put the screws to me over that small of a project.

      • coloredgrayscale@programming.dev
        link
        fedilink
        arrow-up
        2
        ·
        edit-2
        1 year ago

        Especially the other projects that were hidden on someone’s desk until a week before the deadline. And now they have two or more projects like that simultaneously

        • Redkey@programming.dev
          link
          fedilink
          arrow-up
          1
          ·
          1 year ago

          No argument from me; the management was chaos at that place. Those kinds of mistakes were beyond my control, but fortunately they were rare.

      • Redkey@programming.dev
        link
        fedilink
        arrow-up
        1
        ·
        1 year ago

        We were managing our own work with (usually generous) milestones/deadlines determined by other people. As long as we kept meeting goals, no-one looked any deeper. It gave me the freedom to literally put everything else on hold and switch 100% of my attention to this project.

    • Riskable@programming.dev
      link
      fedilink
      English
      arrow-up
      14
      ·
      1 year ago

      This used to happen to me all the time! Except I always gave an estimate of a minimum, “six weeks”. Which was always going to be shorter than the other folks/teams who would always start with a minimum of, “three months”.

      It was a trick, you see. It meant I was always the first person they asked to do anything which meant I got first pick of any given work coming down the pipe 👍. It was more than that though: From experience I knew which projects were real and which were, “management whims”. That is, projects that were going to ultimately get cancelled.

      If you know how the system works you can always get a deadline extended. Especially if you, “went out of your way” to try to get it done faster than everyone else. With this knowledge in mind I would accept the, “six week” project with the anticipation that it would get cancelled after a month which happened at least 50% of the time and 100% of the time if it was a, “management whim”.

      This situation was an extreme disincentive to actually work on any projects at all; because if you spent all day every day working on a project for a month and then in the 4th week it gets cancelled that means you wasted all of your time. You could’ve been surfing the web or learning new skills/frameworks/operating systems/whatever in that time!

      Once I had the system completely figured out I would accept these, “six week” projects and not work on them at all for the first month (I had much better things to do, trust me). If they were still pining over it after that time I’d just request an extra two weeks which would give me a month to actually get it done. Then I’d complete the project–usually in a fucking day or two of dedicated work (e.g. “don’t talk to me; I’m not joining any conference calls today”). Then I would deliver the project on the day it was originally due: Two weeks early.

      I was a hero at that company. The bosses would regularly throw my name out there whenever someone else’s project went over time or over budget, “we should’ve given this to Riskable!”

      Company ended up laying me off and then re-hiring me ~1.5 years later at a vastly increased salary because they, “just couldn’t find anyone that delivered” like I did 😁

      • mosiacmango@lemm.ee
        link
        fedilink
        arrow-up
        11
        ·
        1 year ago

        The breathtaking hubris of even laying off “the guy who always gets things done ahead of schedule.”

    • Steeve@lemmy.ca
      link
      fedilink
      English
      arrow-up
      12
      ·
      edit-2
      1 year ago

      Damn, project like that would’ve taken me 2 weeks out of principal lol

  • CeeBee@lemmy.world
    link
    fedilink
    arrow-up
    48
    ·
    1 year ago

    I had almost this exact scenario.

    I was given a ticket for something I was still unfamiliar with at the time, as I was only about 6 months into the job. The thing I was working on was fairly complex in a very specific and niche subject, so it’s the kind of thing literally no one would know until you work at this place.

    I made the requested changes per the ticket as best as I understood them and fired the ticket back to the BA. Almost a month goes by and the project lead calls me up telling me it wasn’t done properly. After going through what the issue is I remark that now I understand better and will update it. He started on a rant about how if I don’t know something I should be asking and these kinds of changes shouldn’t be left to the last minute only a day before deployment.

    I merely replied that it’s difficult to ask about something when you aren’t even aware of its existence (too hard and too difficult to explain here). But what really set him off was me saying “why am I hearing about this an entire month after I finished the ticket?

    He didn’t know what to say and just hung up the call.

    • lenathaw@lemmy.ml
      link
      fedilink
      arrow-up
      17
      ·
      1 year ago

      I’m saving this phrase.

      I had a PM postpone a critical part of a project since June, the hard deadline is on September 15th… I’ve insisted to start with it months ago and now he’s scrambling everyone to get this done yesterday.

      We’re not gonna make it and I don’t care anymore.

      • Kahlenar@lemmy.world
        link
        fedilink
        arrow-up
        7
        ·
        1 year ago

        Any other situation where the quote applies you can call the poor planner a fucking idiot. Not at work though, so onward this nonsense persists.

  • demonquark@lemmy.ml
    link
    fedilink
    arrow-up
    36
    arrow-down
    2
    ·
    1 year ago

    If there’s one thing I hate, it’s ppl sayin something should have been done yesterday.

    Guess what, if should have been done yesterday, we’ve missed the deadline, we’ve already failed and might as wel write off the project.

    • coloredgrayscale@programming.dev
      link
      fedilink
      arrow-up
      3
      ·
      1 year ago

      Welp, Task failed, no second chances, or options to deliver afterwards. Game over, toss away the work you’ve completed 90% of.

      Just like in school when you failed a test or assignment.

      • OsrsNeedsF2P@lemmy.ml
        link
        fedilink
        arrow-up
        11
        ·
        edit-2
        1 year ago

        Best I can do is add 3 tickets during Monday’s scrum

        ("What do you mean your tickets slipped again?)

          • OsrsNeedsF2P@lemmy.ml
            link
            fedilink
            arrow-up
            2
            ·
            edit-2
            1 year ago

            Nah we get given tickets.

            The tickets only have an ambiguous title, then it’s our responsibility to figure out what it’s about and come up with the estimates.

            After our weekly planning meeting

      • DreadPotato@sopuli.xyz
        link
        fedilink
        arrow-up
        7
        ·
        edit-2
        1 year ago

        No you won’t, because even if everything is perfectly specced you’ll encounter unforeseen issues during implementation. So you’ll either overestimate or underestimate the time required.